At N.V. ELMAR, we are committed to delivering safe and reliable electricity while supporting the continued growth of Aruba's communities. When new developments or connections require expansion of the electrical infrastructure, specific financial arrangements may apply to ensure the long-term strength and sustainability of the grid.
 
To keep our process clear and transparent, we distinguish between three types of financial requirements for new connections and parceling (subdivision) projects.
 

1. Infrastructure Contribution - For Large Developments

For high-demand projects or developments that require a network extension, a one-time contribution may be required. This contribution helps fund the expansion of our distribution network to support your specific energy needs.

This may include:
  • Laying new medium- and low-voltage cables
  • Installing switchgear and protective equipment
  • Engineering, planning, and grid design work

 

A formal contract will be established before any construction begins to ensure agreement on responsibilities, costs, and the scope of work.

Note: this contribution is separate from standard connection fees and applies only when grid expansion is necessary.

 

2. Standard Connection Fee - For All New Connections

Whether you are connecting a home, construction site, or business, a standard connection fee will apply. This fee covers the labor and materials required to connect your premises to ELMAR's existing infrastructure.

Fee is determined by:
  • The requested capacity (e.g., single-phase or three-phase service)
  • The type of connection (residential, commercial, or construction meter)
  • The distance from the nearest distribution point

 

3. Security Deposit - For Parceling (Subdivision) Projects

In larger subdivision projects, ELMAR may pre-install underground cables to allow developers to proceed with civil works such as curbing and roads. In these cases, a security deposit may be requested to protect ELMAR's infrastructure prior to active electrical use.

Key considerations:
  • The deposit is not tied to electricity usage
  • It protects against damage or theft before properties are fully connected
  • Applies only when cables have already been installed and are in place
Deposit Refund Eligibility:
  • All cables are fully operational
  • No damages or losses are identified during inspection
  • The infrastructure is formally accepted by N.V. ELMAR

 

Need help or ready to apply?

Whether you are planning a home, a new business, or a larger development— contact us to ensure a smooth connection to the grid.

Frequently Asked Questions

  • I have trouble with my electricity, how will N.V. ELMAR assist me?
  • There was a power outage in my neighborhood and my appliances got damaged, will N.V. ELMAR provide me with new ones?
  • What should be done when the customer is deceased, in order to transfer ownership of the account?
  • I was involved in an accident and have damaged N.V. ELMAR’s property, what do I need to do?
  • Can I place: signs, flags or a basketball hoop on a pole? 